espaƱol Login Get Registered Catalog Browser Contact Us
Global expert in cables and cabling system

About Nexans

Products and Solutions

Customer Service

Work at Nexans

News and Press

Go

Beijing Airport - New terminal 3

Send link to this page Your Nexans contact on this page

Beijing Airport - New terminal 3

 

 

Beijing Airport - New terminal 3Project description:

  • Bagage Handling System for Beijing Airport Terminal 3, a Siemens Germany and Inter Roller Singapore project

 

Customer challenges:

  • Passenger capacity has more than doubled from 30 to 66.5 million passengers per year.
  • Installation of a system, by Siemens and Inter Roller of a bagage handling system capable to sort and transport up to 19,200 bags per hour.
  • Some 330 check-in counters are connected to a 68 km, high-speed, tray-conveyor system.
    Bags are transported through a 2.2 km tunnel at a speed of 36 km/hour to the loading carousels.

 

 

Beijing Airport - New terminal 3Nexans solutions:

  • 2,500 km of cables: flexible power supply, control, bus and optical fibre cables
  • All cables are halogen free
  • Compliance with all standards for airport applications
  • Full range of cables (power, control, optical) from one supplier
  • Short delivery time




 TOP
Nexans © copyright 2001 - 2012   Legal Notice | Contact Us | Site Map